Bank Estimation

Bank Estimation

S. NODESCRIPTION OF WORKUNITQTYRATEAMOUNT
1Earth work excavation in ordinary soils for columns, foundation, including lead and lift etc.,cft2,413.001843434
2Providing and laying of PCC 1:4:8 concrete for columns footings, foundation bed, including curing etc. completecft23712028440
3Providing and constructing size stone masanory using 1:8 for foundation, Retaining wall including curing etc. completecft52314073220
4Providing and laying of P.C.C 1:4:8 for flooring as D.P.C including finishing curing etc.,cft53411058740
5Providing and laying of pinth with rcc 1:2:4 of thick 6″ including curing etc completecft361380137484
6Providing and constructing of 6″ thick cement brick masanory using 1:6 for load bearing walls including curing etc., completesft5,289130687570
7Providing and constructing of 4″ thick cement brick masanory for partition walls including curing etc., completesft3,050100305000
8Providing and casting RCC lintels using necessary fabrication etc., completecft31817054060
9Providing and casting footing using RCC 1:2:4 for foundation including centering.cft684380259920
10Providing and casting roof using RCC 1:2:4 for roof including centeringcft5,8783802233792
11Providing and casting roof beams & columns using RCC 1:2:4 curing etc., completecft1,260380478800
12

Providing and applying plastering CM 1:4

a) For External walls

b) For inside walls and ceiling

sft

sft

4,821 15,450

60

60

289260 927000
13Providing and fixing windows, ventilaters of teak wood frame including all fittings.sft560550308000
14Providing and laying granite for flooring including skriting and staircasesft1,966230452180
15Providing and laying antiskid parking tiles for flooring including skritingsft63713284084
16Providing and laying of ceramic glazed tiles for toilet, bath walls and flooring in cm 1:6sft934120112080
17Providing and laying 1st class teak wood for main and pooja door including all fittings, polishing etc, complete.sft2401,200288000
18Providing and laying of flush door with red sal frame of size 5″*3″ including all fittings, etc, completesft416550228800
19Painting inside walls with one coat primer four coats putty and two coats emulsan paintsft15,45025386250
20Painting outside one coat white cement and three coats snow cem including curingsft4,8212096420
21W.P.C for terrace including finishing and curing etc completesft8227561650
22Fabricating steel for roof, columns, beams including fabricating charges etc completetonne14.6963,000925470
    Total85,19,654.00
23Providing of water supply, sanitary and electrical works  12% of total cost10,22,358.48
24Providing and furnishing wardrobes by using 19 mm thick water proof plywood inside sun mica finish outside 4 mm thick veneer with melamine polish and duco paint wherever applicablelumpsum  600000
    Total1,01,47,012.00
     
(Rupees One Crore One Lakhs Forty Seven Thousand and twelve only)